We aspire to be the friendliest place to play and learn bridge on the planet. Bridge bullies are not welcome. See more about the Zero Tolerance Policy here.
Newcomers to Bridge
There's always a new series of Bridge — Introduction starting within a few weeks. Our schedule is designed to allow working people and students to learn and enjoy bridge.
Dip a toe into bridge any Monday through Thursday afternoon for Office Hours, 3-5 PM. The club will be open for casual bridge play.
Intermediate Players
Browse our schedule of classes designed to improve and stretch your bridge skills.
Weekly games limited to novice and intermediate players are held Tuesday evenings at 7:00 p.m. and Saturday afternoons at 1:00 p.m.
Established Bridge Players
Enjoy our full duplicate games Monday through Friday at 11:00 a.m. and Saturdays at 1:00 p.m. Play 24 boards, finish before the heaviest traffic on I-210.
Wear Your Favorite Bridge Club
Visit our new Lands' End catalog for a huge selection of clothes and accessories, and add the classy Pasadena Bridge Club logo to your wardrobe.
Today I took delivery of some long tables and a director's desk. They're all still boxed up. I put out a few tables, and I'm washing the table felts two at a time at home.
Saturday we'll have a work party to put together chairs and end tables, and maybe put up some shelving. I set up one chair, and without a power screwdriver, it's pretty painful! Six screws for each chair back.
AT&T discovered that they have a fiber pole near the suite. Tomorrow they're going to put that in, and I have an electrical contractor walking through to set up the ethernet wiring.
Arrived this afternoon! They were loaded on two pallets and wrapped in shrink wrap. Of course the pallets wouldn't fit into the elevator, so the delivery guy was good enough to help me break them down and get them up to the bridge club.
Then the security guy helped me get the pallet trash hauled off. :)
Here's a flier to be distributed at tournaments and parties and however else you like. By all means, download and share with friends. Click the image to download.
Today was all about the floors and carpet. The plumber worked on the fixtures. And I took delivery of 18 folding tables, 17 end corner tables (19 more on the way), and a computer printer. Those FedEx guys are good!
Today I get the keys to the bridge club, and I'm here expecting delivery of tables. The floors are stripped bare, ready for new carpet and flooring for the back room. There's beautiful new cabinetry in place for the kitchenette. There's room for an ice machine, and it's ready for a good coffee maker.
Supposedly the carpets and flooring will be in tomorrow (Tuesday). Getting internet is going to be a little painful, but I'm working on it!